ZDY2300 fully hydraulic tunnel drilling rig for coal mines factory direct sales
search
|
ZDY2300 fully hydraulic tunnel drilling rig for coal mines factory direct sales
Details Fully hydraulic tunnel drilling rig for coal mines Fully hydraulic tunnel drilling rig, water exploration drilling rig, meter coal mine water exploration drill, Chongqing tunnel drilling rig, water exploration drilling rig, fully hydraulic tunnel drilling rig for coal mines, tunnel drilling rig, hydraulic tunnel drilling rig Purpose and Scope of application The fully hydraulic tunnel drilling rig for coal mines is mainly used for drilling gas extraction (discharge) holes, grouting fire prevention holes, coal seam water injection holes, outburst prevention and pressure relief holes, water exploration holes, and geological exploration in coal mines. holes and other engineering drilling. It is suitable for drilling various coal and rock formations with rock solidity coefficient < With the appropriate configuration of drill bits, drill pipes and other drilling tools, engineering operations such as coring and drilling of soft coal seams can also be carried out. Main technical features The drilling rig has a fully hydraulic power head combined structure. It is composed of hydraulic pump station, power head, frame, operating platform, column support and other parts. , good disassembly performance, convenient for relocation and shifting of underground drilling rigs, and flexible drilling site layout. , Unique hydraulic system, double pumps. The rotation parameters of the drilling rig can be adjusted independently, which improves the drilling rig's adaptability to various drilling processes. The rotary spindle adopts a through-hole structure, and the length of the drill pipe is not limited by the feed stroke. The drill pipe can be configured according to the conditions of the underground drilling site. , hydraulic chuck and hydraulic clamper are used to clamp and unload the drill pipe, which is simple to operate, high efficiency, labor-saving and safe. The oil pipes are connected between the operating platform, pumping station and main engine, and the operations are centralized. Personnel can operate away from the wellhead, which is beneficial to personal safety. , four-column support, lifting cylinder to adjust the fuselage (that is, the drilling inclination angle is convenient and labor-saving. , equipped with a variable pump for stepless speed adjustment, adaptable to a wide range of working conditions. 3. Main Technical parameters Parameter name Drilling depth Final hole diameter Drill pipe diameter Drill Hole inclination angle Output torque Feeding capacity Pulling capacity Motor power Main machine overall dimensions Overall machine weight (excluding drill pipe) A total of0articles Related Comments: |